- Table Lamps & Reading Lamps[3]
- Marble[5]
- Plastic Tubes[4]
- Moulds[7]
- Plastic Profiles[3]
- PVC[3]
- Other Plastic Products[2]
- Plastic Sheets[2]
- Other Timber[4]
- Other Boards[2]
- Balustrades & Handrails[3]
- Fencing[3]
- Other Plastic Building Materials[4]
- Other Door & Window Accessories[4]
- Wiring Ducts[1]
- Contact Person : Mr. Li Allan
- Company Name : Shaoxing Tongji Plastic Industry Co., Ltd.
- Tel : 86-575-8460-8332
- Fax : 86-575-8460-5878
- Address : Zhejiang,Shaoxing City,Lougong, Lanting, Shaoxing, Zhejiang, China
- Country/Region : China
- Zip : 312044
Handrail
1.Mounted on a sturdy 0.080" (2mm) thick continuous aluminum retainer
2.Easy installation, clean-up and maintenance
3.All mounting fasteners are included with each order 4. there can be made as per customers' requirements, several patterns and finishes optional.
1..Adopting high-polymer as outer decors: PVC,PP/ABS, antisepsis and antibiosis;
2.Simple installation, easy maintenance and durable service;
3.Multi-kind-color smooth lines;
4.Inside-lining with Cl-alloy or stainless steal, so firm and reasonable;
5.Surface finishing, fireproof, fast light, clean and simple;
6.Using steady firm support in order to provide reliable protection for weak disabled groups' walk.
Our company has been the membership of
Assessed Supplier for five years.
Company Profile
We are one of the leading supplier of plastic extrusion mold and extrusion products.
Have the ability of producing more than 500 sets of extrusion mold s in a year.
We have been in this plastic industry for 13 years
Steps of Making Mould and Products
1.drawings or samples provided | Get the drawings or samples from our customers |
2.Research & Development | The quality, mold life, arrangement, price, material, delivery time, payment term, etc. |
3.Place an order with first payment | Receive the purchasing order and the first payment bank receipt from your side |
4.Mould design Confirmation | Design the mold for you as per your drawings |
5.Mould making | According customer's specifications to build the mould. Before making the mould, we'll send mould design for customer's approval |
6.Sample making | Do the mold test and send the samples for approval till you confirm it |
7.The delivery time of mold or products | 7-25 days |
8. Delivery | To deliver goods by sea or by air, according to customers' requirements. |
9. Balance Payment | T/T |
Material: PVC/PE/PP
Packing and Service
Inner packing:Plastic film (PE) or as your request
External packing and Loading process
Sevice: Mold test of new parts; products following up; continuously improvement of products after batch production; getting products feedbacks from customers
Our working time: 8:00-17:00 (BEIJING TIME)
Handrail